Contacts

Via della Lupa 2
20063 Cernusco sul Naviglio 
Città Metropolitana di Milano

Telephone

Tel. +39 02 91111385
Tel. +39 02 84573357

Follow us

SAUDI ARABIA – ABU ALI BERRI DEVELOPMENT

Design and executive drawings of 13 buildings for the construction of the BERRI DEVELOPMENT, Expand Abu Ali Crude Processing Facilities & KGP Gas Expansion Facilities project in Saudi Arabia.
The interventions concern various aspects including:
• Architectural design;
• Structural Design;
• Ergonomic study of the building's Control Room;
• Modeling using BIM technology (LOD 300) trying to eliminate interferences before the construction phase;
• Design of the building's mechanical system, including water and sanitary systems;
• Management and control of material quantities, extracted from the model.
Client
Saipem S.p.A.
Place of intervention
Saudi Arabia
Start and end of project
2020-2023

SERVICES PERFORMED

Executive planning

Drafting of executive tables

Ergonomic Report Drafting

Drafting tables attached to the report